Tuesday, January 29, 2013

SNOW DAY! Discuss design and programs here.


3 comments:

  1. Hi is any one on to talk with aboutthe rover

    -G.Ferrari AOA

    ReplyDelete
  2. Hi team Amerigo, as we all know the drop is on Friday and I have been noticing that some of the teams have not yet tested their programs. They aren't sure if they are going to work so we need to test them as soon as possible that way our misssion will be a success and we make it safely to Spartan2017 and collect the data we need.
    C.Engineri,CorNav

    ReplyDelete
  3. On our rover we have finished our design of the rover and we basicaly are finished with the programs. For the design, our iPod mount is set and can see the RAT perfectly. Everything else on the rover is were it needs to be. Now for the programs, the RAT's program to drill in the rock is now perfect and ready for friday. The magnet sensor to turn the rover north is functionally working well. The light and touch and light sensor is still being worked on but is close to being done.
    G.Buck, engineer, VCom

    ReplyDelete